Shenhua Ningxia Coal Industry Group Co., Ltd.

    

Shenhua Ningxia Coal Industry Group Co., Ltd. is a large-scale energy company listed on January 18, 2006 by Shenhua Group on the basis of the former Ningxia Coal Industry Group Corporation through capital increase and share expansion. It is a holding company of Shenhua Group. The company has a registered capital of 10.1 billion yuan and total existing assets of 25 billion yuan.



The company's main business is coal mining and washing, coal chemical industry, electric power, construction, machinery manufacturing, etc. There are 14 pairs of coal production mines, 3 coal washing plants, 61 coal chemical, electric power, construction and other units, and 50,387 employees. In 2006, coal output was 33 million tons, and by 2010, coal output will reach 80 million tons. Shenhua Ningxia Coal Group currently has 24.1 billion tons of coal reserves. In the coal chemical industry, a 250,000-ton methanol project has been completed and put into production. Dimethyl ether and coal-based olefin projects are under construction (total investment of 17 billion yuan). 100 million yuan). In the field of electric power, the 2×135MW project of Lingzhou Power Plant has been put into production, with a planned 4×600MW; the construction of the Ningdong Gangue Power Plant Project with a planned capacity of 1200MW (4×300 MW) will start soon.

 

Ningdong Gangue Power Plant is a coal gangue comprehensive utilization project solely funded by Shenhua Ningxia Coal Industry Group. The National Development and Reform Commission listed the project as a start-up project in 2009 with the document of Development and Reform Office [2007] No. 1985. The plant is located in the planning area of Ningdong Coal Power Base in Lingwu City under the jurisdiction of Yinchuan City, Ningxia Hui Autonomous Region. It is an economical, environmentally friendly, and sustainable large-scale modern power plant. The first phase of the project is to construct 2×300MW subcritical, air-cooled, circulating fluidized bed, and pure condensing units, and reserve a site for further expansion. The investment is about 3 billion yuan. The construction is planned to start in March 2008 and both units will be put into operation in 2010. Power generation, the annual power supply is about 3.3 billion kWh, and the economic benefits are considerable after it is put into production.

 

Ningdong Gangue Power Plant is in urgent need of excellent undergraduate and junior college graduates majoring in thermal power engineering, applied chemistry, power systems and automation, thermal control, and centralized control operation of thermal power plants. The registered permanent residences of new graduates will be moved to Yinchuan City, and the company will provide accommodation and staff canteens.


 

The company has used 4 sets of SRC-300SA (flow rate 34m³/min, pressure 1.0MPa, voltage 380V) and 5 sets of SRC-470SWG (flow rate 60m³/min, pressure 0.8MPa, voltage 6000V) from Shanghai Schneider Sunshine since 2008. The compressor is mainly used for power plant ash removal system gas, instrument gas, and pneumatic tool gas.

   